Assignment 4: Project Progress
Due
Week 9 and worth 200 points
Note: The assignments
are a series of papers that are based on the same case, which is located in the
Student Center of the course shell. The assignments are dependent upon one
another.
During
the project life cycle, project risk reviews and reports are required as
previously identified in the risk management plan. Two months after the project
started, the following events have taken place:
1. The
top-two (2) threats have occurred.
2. The
top opportunity has been realized.
3. The
project’s risk budget is already exhausted.
4. The
risk management schedule has been shortened by two (2) months.
Write
a five to seven (5-7) page paper in which you:
- Analyze the
impact of those events on the project.
- Determine
if any mitigation activities are required and explain why.
- Determine
if budget / schedule changes are necessary and explain why.
- Update the
risk register and highlight the changes made. Provide the justification
for the changes.
- Use at
least four (4) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality
resources.
Your
assignment must follow these formatting requirements:
- Be typed,
double spaced, using Times New Roman font (size 12), with one-inch margins
on all sides.
- Include a
cover page containing the title of the assignment, the student’s name, the
professor’s name, the course title, and the date. The cover page and the
reference page are not included in the required assignment page length.